Stream Smart works with contractors, landowners, and other professionals responsible for road-stream crossings to construct culverts that maintain fish and wildlife habitat while protecting roads and public safety.

Maine Audubon and partners launched Stream Smart in 2011. Since the start of this project, we have hosted workshops and field trainings for more than 1,500 people across the state, reconnecting hundreds of miles of stream habitat for wildlife. Stream Smart road crossings let the stream act like a stream and make the road invisible to the stream.

View the Stream Smart Handout and Maine Stream Crossings: New Designs to Restore Stream Continuity fliers to learn more.

Why are streams important?

Streams are important habitat for fish and other wildlife. Eighty-five percent of wildlife species either live in or use riparian (water-related) habitats throughout the year to breed, travel, and find food and water.

In Maine, brook trout, Atlantic salmon, river otters, and other wildlife get stuck at decaying, undersized stream culverts.One of the least visible elements of our built infrastructure, stream culverts allow roads to cross Maine’s vast network of streams. Surveys show that up to 90 percent of Maine culvert crossings make movement difficult or impossible for wildlife at least part of the year. When wildlife habitat is fragmented like this, it can result in population declines and the loss of species.

View the Value of Stream Smart Road Crossings Presentation  (PDF) for an overview.

Why are Stream Smart crossings a wise investment?

Stream Smart road crossings last longer than traditional culverts and reduce maintenance costs, saving money in the long term. Stream Smart crossings can typically withstand flooding and can better weather the increasingly intense storms we are experiencing without damaging the road.

This video shares three success stories include a bridge on private forest land, municipal water bond project, and a road crossing replaced by Maine Dept of Transportation. 

Project Planning and Support

Inventory and Planning

An inventory of the current road-stream crossing structures that includes information about the condition, type, size, and wildlife barrier status is an important tool for proactive planning. Knowing which structures are priorities for replacement due to infrastructure issues and/or high habitat values allow road managers time to plan, budget, and pursue funding for the most cost-effective outcome.

Inventory and planning resources

The Maine Stream Habitat Viewer is an online map viewer of surveyed road-stream crossings on public roads statewide. As of 2017, nearly 90 percent of Maine’s perennial stream crossings on public roads have been surveyed. Each surveyed crossing includes information about condition, size, and barrier status for fish and wildlife movement, as well as photographs of the site.

The Viewer also offers map layers of high value fish species habitat, including Atlantic salmon and brook trout, as well as data summarizing the habitat values associated with each surveyed road-stream crossing site. The size of the existing structure in relation to the estimated bankfull width of the stream and the number of miles of stream that would be restored if the barrier was replaced with a Stream Smart crossing can be extracted from the attributes at each crossing.

If you have questions about the tool, please contact Sarah Haggerty at Maine Audubon or Alex Abbott at the US Fish and Wildlife Service, Gulf of Maine Coastal Program.

Maine Stream Habitat Viewer Information Sheet – 2024 (PDF)

Maine Barrier Survey Status map – 2021 (PDF) shows the status of road-stream crossing barrier surveys statewide.

The Stream Crossing Survey Data Update (PDF) is a form we request road managers fill out and submit to help update the Maine Stream Barrier Inventory Database when crossing data is incorrect or a crossing has been replaced since it was last surveyed.

The Maine DOT Work Plan Viewer is an online map of road work planned over the next three years. If a road-stream crossing site has been identified by the road manager as a priority for replacement, planned work by MaineDOT may be an opportunity to collaborate. To be most effective, work with MaineDOT very early in the process.

The MaineDOT Work Plan information sheet

Building a Stream Smart culvert has many steps and procedures. Technical assistance may be available for project planning, project management, fundraising, on-site assistance, culvert barrier inventories, prioritization, fish and wildlife habitat, structure design, and permitting.

Technical assistance resources

• The Stream Smart Partners Technical Assistance for Road Crossings guide can help you determine which of our partners may be able to assist you.

• Earthwork contractors must be certified by the Maine Department of Environmental Protection. Certification credit is available to contractors that have attended Stream Smart trainings.

• The NRCS Culvert Assistance Handout for private landowners.

• The USDA NRCS Environmental Quality Incentives Program provides technical and financial assistance for farm and non-industrial forest land private owners.

• The Soil and Water Conservation District (SWCD) and NRCS Offices in Maine (while NRCS is limited to private landowners, SWCD can assist both municipalities and private landowners).

It is important to find out what permits you may need early in your project planning process. In many instances, you may need both a state of Maine Department of Environmental Protection and a federal Army Corps permit (which have different standards).

Additionally, much of Maine is critical habitat for the federally listed Atlantic Salmon. If you are working in Atlantic Salmon habitat, you will need an Army Corps permit and can receive assistance from the US Fish and Wildlife Service. Contacting agency staff to discuss your project early in the process will help ensure success.

This Flowchart for Stream Crossing Permitting will help you determine what types of permits you may need.

Tips for efficient permitting

• Start permitting process as soon as possible
• Discuss your project with permitting agencies before submitting application
• Provide clear, well-labeled drawings of the crossing design
• Meet or exceed design requirements for each reviewing agency
• Demonstrate that you pay attention to detail

Elements of a strong permit

• Speed: the shortest feasible work window will minimize the amount of time the site is opened-up and vulnerable to the elements
• Erosion control: make sure all exposed soils are protected throughout the process
• Dewatering and bypass: ensure that you have adequate coffer dams, pumps/hoses and settling basins
• Stream life is protected: for example, at one crossing, 58,000 fish were moved from the work area to prevent stranding

Resources for state permitting

State of Maine Department of Environmental Protection Natural Resources Protection Act Permit By Rule Standards Chapter 305 has the guidelines and requirements for meeting the state permitting requirements for organized towns. A notification form is required.

Maine DEP Stream Smart Workshop Presentation contains an overview of the state permitting requirements for organizations.

Contact the Maine DEP Land and Water Bureau office nearest you for assistance:

• Augusta: 17 State House Station, Augusta, ME 04333-0017. (207) 287-3901. Toll free 1-800-452-1942
• Bangor: 106 Hogan Road, Bangor , ME 04401. (207) 941-4570. Toll free 1-888-769-1137
• Portland: 312 Canco Drive, Portland , ME 04103. (207) 822-6300. Toll free 1-888-769-1036
• Presque Isle: 1235 Central Drive, Presque Isle, ME 04769-2094. (207) 764-0477. Toll free 1-888-769-1053

The Land Use Planning Commission Standards is an overview of state permitting requirements for the unorganized townships.
Contact the Maine Land Use Planning Commission at (207) 287-2631 or visit the website.

Resources for federal permitting

Department of the Army General Permit – State of Maine has the guidelines and requirements for meeting federal permitting requirements. See number 22 on pages 12-14 for details. A notification form is required.

Army Corps of Engineers Permits gives an overview of their jurisdiction and permitting program and reviews stream crossing requirements. Contact the US Army Corps of Engineers Maine Project Office in Manchester at (207) 623-8367 for assistance or visit US Army Corps of Engineers – Maine

Resources for learning about Atlantic Salmon

United States Fish & Wildlife Service Endangered Species Act gives an overview of the federal Endangered Species Act and contains a map of the regulated Maine Atlantic salmon habitat.
Atlantic Salmon and the Endangered Species Act (as well as contact information for US Fish and Wildlife Service staff in Maine that can assist you with your project)
Map of Maine Atlantic Salmon Habitat

A Stream Smart culvert design should follow the 4 S’s:

The culvert must SPAN the stream, allowing for passage of aquatic and terrestrial wildlife.

The culvert has to be SET at the right elevation.

The SLOPE of the culvert must match the stream.

There must be SUBSTRATE (natural sediment) in the crossing.

The goal is to let the stream act like a stream and make the road invisible to the stream.

Design resources

This manual from the US Department of Agriculture Forest Service is the most comprehensive and complete resource available. It is the basis for Stream Smart crossing design.
• The Maine DOT Stream Smart Road Crossing Pocket Guide provides basic explanations for installing and replacing crossings.
• View the Stream Smart workshop presentation, How to Create Stream Smart Crossings.
Read this handout for an example of a Stream Smart design process for a small stream.
• The Comparison of Road-Stream Crossing Structures Handout summarizes the difference between different construction techniques.
Maine StreamStats is a tool for delineating a basin and estimating a wide variety of streamflow statistics.

Stream Smart Field Assessment Process

All Stream Smart designs start with a field assessment of the construction site. The following measurements should be taken:

• Longitudinal profile to determine elevation of stream features and slope
• Cross sections to determine channel width and stream form
• Substrate assessment, including key pieces and pebble counts

Watch the field assessment video to learn how these field measurements are taken. View here > (opens in YouTube)

Field assessment resources

• Use Stream Barrier Removal Monitoring Guide (pages 77-81) to record your field data, specifically the following:

1. Cross-Section Survey Data Sheet
2. Longitudinal Profile Survey Data Sheet
3. Pebble Count Data Sheet

• Use the Stream Smart Reference Reach Survey to enter your field measurements. This includes cross section analysis and longitudinal profile to develop a preliminary Stream Smart design.

Stream Channel Reference Sites: An Illustrated Guide to Field Technique provides technical instruction on establishing permanent references sites for gathering data about a stream.

• The Maine Stream Smart Road Crossing Field Workshop Glossary is a helpful resource of commonly-used terms.

Financial assistance may be available for some Stream Smart road crossing projects. Projects with high conservation value for fish passage, such as Atlantic Salmon, alewife, or Eastern Brook Trout, may be eligible for financial assistance through partnership with a conservation program.

Possible funding sources

Funding Opportunities for Stream Smart Road Crossings is an overview of grant programs.

• Private landowners, specifically farm & non-industrial forestland private owners, may be eligible for funding through the USDA NRCS Environmental Quality Incentives Program.

There are many different types of structures that can be used for Stream Smart road crossings. Each stream location is unique and requires its own solution to best meet the 4 S’s.

The following videos demonstrate different construction techniques (opens in YouTube):

Stream Smart Overview
Concrete Block Abutment Timber Deck Bridge
Bottomless Concrete Arch
Bottomless Metal Arch
Geosynthetic Reinforced Soil Integrated Bridge System (GRS-IBS)
Embedded Concrete Box Culvert

Construction tips

• Review the plans on-site with principal people and contractors
• Have materials and equipment on site and ready before breaking ground
• Stick to the plan, but remain flexible

Monitoring

Visit your site after construction, especially after high flows, to confirm the crossing is working as intended—and to admire your work making real, on-the-ground changes that create longer-lasting roads and support fish and wildlife conservation! In some cases (when funders require it), additional monitoring of stream channel changes provides vital information that demonstrates how successful Stream Smart crossings can be in reconnecting our streams and restoring habitat.

Partners and Supporters

Sarah Haggerty
Conservation Biologist & GIS Manager
Maine Audubon
20 Gilsland Farm Road, Falmouth, ME 04105
(207) 781-2330 x225
shaggerty@maineaudubon.org
MA Logo Stacked COLOR_

Heidi Bunn, Aquatic Restoration Engineer
Chris Reidy, Fisheries Biologist
Natural Resources Conservation Service
967 Illinois Ave. #3
Bangor, ME 04401
(207) 990-9505/ (207) 990-9504
heidi.bunn@usda.gov/chris.reidy@me.usda.gov

NRCS logo
Hadley Couraud
Aquatic Restoration Manager
The Nature Conservancy in Maine
14 Maine Street, Suite 401, Brunswick ME 04011
(207) 607-4822
hadley.couraud@tnc.org
TNC logo

Bill Bennett
Fish/ Wildlife Biologist
US Fish and Wildlife Service, Maine Field Office
Gulf of Maine Coastal Program
4R Fundy Rd., Falmouth, ME 04105
(207) 781-8364
william_bennett@fws.gov

US Fish and Wildlife Service logo

Christopher Federico
Executive Director
Project SHARE
14 Boynton Street
Eastport, ME 04631
(207) 853-0931
cfederico@gmail.com

Project Share logo

Pete Johnson
Maine’s SFI Implementation Committee Director
535 Civic Center Drive
Augusta, ME 04330
(207) 622-9288
pjohnson@sfimaine.org

SFI Implementation Committee logo

Wes Ashe
Maine Department of Inland Fisheries and Wildlife
Southwest Division
270 Lyons Road
Sidney, Maine 04330
(207) 547-5300
Wesley.Ashe@maine.gov

MDIFW logo

Tom Gilbert
Maine Forest Service
Water Resources Specialist
22 State House Station
Augusta, ME 04333
(207) 287-1073
thomas.gilbert@maine.gov

Maine Forest Service logo

Slade Moore
Habitat Restoration Coordinator
Maine Coastal Program/Maine Department of Agriculture, Conservation and Forestry
PO Box 341
Bristol, ME 04539
(207) 837-3805
smoore@bioconserve.net

Maine Coastal Program logo

John Maclaine
Non-Point Source Training Center Coordinator
Office of The Commissioner
Department of Environmental Protection
17 State House Station
Augusta, ME 04333
(207) 615-3279
john.maclaine@maine.gov

Maine DEP logo

Tim Carr
Senior Planner
Land Use Planning Commission
(207) 592 – 4129
Tim.Carr@maine.gov

DACF - logo - patch - LUPC

Charles Hebson
Hydrologist
Maine Department of Transportation
State House Station 16
Augusta, Maine 04333
(207) 624-3100
charles.hebson@maine.gov

Maine DOT logo

US Army Corps of Engineers
Maine Project Office
(207) 623-8367

US Army Corps of Engineers logo

Matthew E. Bernier, P.E.
Fisheries Habitat Restoration Specialist
NOAA Fisheries
Maine Field Station
17 Godfrey Drive Suite 1
Orono, Maine 04473
(207) 866-7409
Matthew.Bernier@noaa.gov

NOAA logo

Matt Craig
Casco Bay Estuary Partnership
PO Box 9330
34 Bedford Street
Portland, Maine 04101
(207) 228-8359
mcraig@usm.maine.edu

Casco Bay Estuary Partnership logo

Landis Hudson
Maine Rivers
P.O. Box 782
Yarmouth, ME 04096
(207) 847-9277
landis@mainerivers.org

Maine Rivers logo

The Stream Smart program has been made possible by support from the following organizations and foundations:

• Maine Coastal Program
• Maine Outdoor Heritage Fund
• Nellie Leaman Taft Foundation
• USDA Natural Resources Conservation Service (NRCS)
• Poland Spring
• Sally Mead Hands Foundation
• Elmina B. Sewall Foundation
• National Fish and Wildlife Foundation
• Davis Conservation Foundation